Viewpoint 100k (G)
101km/4300ft RUSA Brevet
| Start time | Saturday August 8, 2026 7:00 am |
|---|---|
| Time limit | 7 hours 22 minutes (including 38 gravel bonus minutes). Ride ends on Saturday August 8, 2026 2:22 pm. |
| Start location | Dirt parking lot on corner of Jimmy Durante Blvd and San Dieguito Dr. Street parking is available in the neighborhood area further down San Dieguito Dr about 0.5 - 1 mile from Viewpoint Brewery |
| Finish location | Viewpoint Brewery, Del Mar, CA |
| Map | rwgps |
| Organizers | Aliya Weise |
| Registration info | Brevet has already taken place. |
| Registered riders | There are 8 registered riders. Geoff Birch Osvaldo Colavin Mark Galiano Aaron Holdaway James Pringle Wei Sun Aliya Weise Mudi Yang |
| Pre-ride workers | Aliya Weise |
| Results | RUSA results page |
A beer after a gravel ride in August, is there a happier thought?
This mixed terrain route will start at the dirt parking lot (paid parking I’m afraid) where the Coast to Crest Trail begins. You’ll jump on the C2C trail following along the San Dieguito Estuary until El Camino Real by the Polo Field, where you’ll continue on paved roads through Rancho Santa Fe. You’ll pick up the Del Dios Gorge trail to then ride along Lake Hodges to Mull Hill exit on Highland Valley Rd.
Due to closure of the Beeler Canyon access off of Sycamore Canyon Rd, the route has been diverted to ride along the South Poway trail via Gate Dr. You’ll get to ride through the Community Rd tunnel to continue west, crossing Pomerado Rd to continue on the trail through a part of Penasquitos Canyon before climbing the Powerline trail to Del Mar Mesa. You’ll descend down the fire road to access Deer Canyon trail before entering the 56 bike path for the finish at Viewpoint.
This route is rated moderate in terms of trail riding. Parts of South Poway trail can be challenging.
Please read our accepted proof of passage.
